Tag: everett

Comment letter on Waterways Application #W18-5358: Proposed bike/ped path from 80 Alford St/Route 99 to Draw Seven Park Ch 91 license

Comment letter on Waterways Application #W18-5358: Proposed bike/ped path from 80 Alford St/Route 99 to Draw Seven Park Ch 91 license

January 24, 2019

Jerome Grafe
MassDEP Waterways Program
1 Winter Street, 5th floor
Boston, MA 02108

RE: Waterways Application # W18-5358: Proposed bike/ped path from 80 Alford St/Route 99 to Draw Seven Park Ch 91 license

Dear Jerome,

WalkBoston is excited to hear of the proposal for a new bike/ped path connecting Draw Seven Park in Somerville to Route 99 in Boston/Charlestown. This path, atop the new MBTA sea wall at 80 Alford Street, will be a terrific boon to the Mystic River path network.

We support the Friends of the Community Path (FCP) and the Somerville Transportation Equity Partnership (STEP) in asking for the following revisions to the proposed path design:

  1. Widen the path from 10’ to 12’-14’ wherever possible.
  2. Ensure that the path design will be harmonious with the ongoing Mystic River bike/ped bridge design, so that there will be an appropriate path connection to the future Mystic River bike/ped bridge at the Draw Seven Park edge of the MBTA busway property.
  3. Ensure that the path design does not preclude a signalized crosswalk over Route 99 for safe bike/ped access to Ryan Playground, the Schraffts building, and the Boston Harborwalk. Plans for a safe bike/ped crossing at this location will also need to take future roadway projects on Rutherford Avenue into account.
  4. Connect the path to one of the public roads (Beacham Street or Moosal Place/Sherman Street) that connect to Broadway, so that pedestrians and cyclists need not go all the way to Assembly Square and then turn back in order to reach Broadway.

We also support FCP and STEP’s call for a public meeting about this proposal. Given that this path will be an important link in the Mystic River path network, many stakeholders and members of the public have a compelling interest in these issues. WalkBoston looks forward to continued engagement to ensure that this critical path connection moves forward.

Sincerely,

Wendy Landman
Executive Director

SAMPAN – Everett becomes first local city to speed bus commute with raised platforms

SAMPAN – Everett becomes first local city to speed bus commute with raised platforms

SAMPAN: “Everett becomes first local city to speed bus commute with raised platforms

“Fixing the ‘last mile’ is often cited as an important goal for transportation agencies and advocates to improve how people get from their transit stop to final destination. Adding boarding-level platforms in Everett shows a commitment to the ‘last six inches,’ too,” said Wendy Landman, Executive Director of WalkBoston. “These last six inches are critical elements of age and disability-friendly communities, growing bus ridership, and improving mobility for all community members.”

Posted July 17, 2018

Sullivan Square/Rutherford Avenue Design Project Comment Letter

Sullivan Square/Rutherford Avenue Design Project Comment Letter

April 11, 2018

Boston Metropolitan Planning Organization (MPO)
c/o Alexandra Kleyman AICP
TIP Manager
Transportation Building
10 Park Plaza, Suite 2150
Boston, MA 02116

Re: Sullivan Square/Rutherford Avenue Design Project (SS/RA Design Project)

Dear MPO Council and Staff,

WalkBoston has been engaged in and following the planning and design of Sullivan Square/ Rutherford Ave. for many years. The redesign of the streets and roadways for this part of Boston should reflect what the people of Charlestown, Somerville and Everett deserve as a hub for walking and transit, and should create opportunities for the redevelopment of what has long been a neglected, dysfunctional and unsafe auto-­centric wasteland.

We believe that the decisions about designs for both Sullivan Square and Rutherford Avenue should be made based on a thorough review of all of the options available for the roadways. Special attention should be given to providing a primarily at-grade street system with opportunities for at-­grade redevelopment of parcels (that do not require air rights or decks) as this will provide the greatest opportunity to create a sense of place, answer the long-­term transportation needs of this dense urban location, provide for safe mobility for all street users and allow for climate resilient designs.

We write to the MPO to request that funding for the project be deferred in the TIP so that there can be sufficient time for review of the alternatives that have been developed by Northeastern Professor Peter Furth at the request of Charlestown residents. The designs that he has developed provide opportunities to improve pedestrian and bicycle safety, add landscape improvements and enhance development opportunities.

Thank you for your attention to this significant project.

Sincerely,

Wendy Landman
Executive Director

Riverpaths of Everett, Somerville and Medford Walking Map

Riverpaths of Everett, Somerville and Medford Walking Map

The walk begins at the Orange Line Wellington Station. The route is roughly 4 miles and ends at the Orange Line Sullivan Square Station.

The Mystic River gets its name from the Indian word Misi-Tuk for Great Tidal River. In colonial times the settlers saw that the Mystic was deeper than the Charles and water-dependent industry sprang up on its banks. With Boston’s 9 foot tidal range, the tide would run all the way up to the Mystic Lakes. For over 200 years, residents relied on the tide to wash wastes out to sea. The river’s industries left a legacy of a stew of chemicals that settled to the bottom. The original riverbeds were diverted over the centuries for industry, homes and highways. What you see today, both the good and the bad, are the starting points for reclaiming our rivers.

Click for “Riverpaths of Everett, Somerville, Medford Walking Map” PDF



Click for “Riverpaths of Everett, Somerville, and Medford” Walking Map on Google Maps

Comments on Sullivan Square/Rutherford Avenue Design Project 3/31/17

Comments on Sullivan Square/Rutherford Avenue Design Project 3/31/17

March 31, 2017

Deputy Commissioner James Gillooly
Boston Transportation Department, 7th floor
1 City Hall Square
Boston, MA 02201

Re: Sullivan Square/Rutherford Avenue Design Project (SS/RA Design Project)

Dear Deputy Commissioner Gillooly,

WalkBoston has been engaged in and following the planning and design of Sullivan Square/Rutherford Ave. for many years. We have consistently and persistently noted that the redesign of the streets and roadways for this part of Boston should reflect what the people of Charlestown, Somerville and Everett deserve as a hub for walking and transit, and should create opportunities for the redevelopment of what has long been a neglected, dysfunctional and unsafe auto-­centric wasteland.

We strongly believe that an at-­grade street system with opportunities for at-­grade redevelopment of parcels (that do not require air rights or decks) presents the greatest opportunity to create a sense of place, answer the long-­term transportation needs of this dense urban location, provide for safe mobility for all street users and allow for climate resilient designs.

Over the last decade transportation planners and engineers across the United States have come to understand that adding roadway capacity in multi-­‐modal, dense urban environments simply means that more people will drive their cars and fill up the roads. We’ve learned from years of mistakes that building large roads that look and feel like highways through communities encourages high speed traffic, attracts more vehicular traffic and traffic congestion, cuts off parts of neighborhoods.

The roadway, transit and sidewalk network at the heart of the Boston metro area should meet the multi-­‐modal needs appropriate to the land uses and neighborhoods that surround the roadway network. With I-­‐93 directly adjacent to Sullivan Square and Rutherford Avenue, this part of the region already houses a regional road system that serves longer distance travelers.

Slowing traffic down on Rutherford Ave and keeping regional traffic off of local roads will better protect Main St, Bunker Hill St and Medford St. the local streets are 1-­lane in each direction, with parking on both sides, and a number of traffic lights. It is counter-­‐intuitive to think that anyone might navigate off of Rutherford Ave and onto these streets in order to go faster. Waze and other similar tech services will always show drivers the fastest routes – if Rutherford Ave is faster than I-­93, Waze will route even more drivers through Charlestown.

The City’s new plan, Imagine Boston 2030 states the case that WalkBoston is making here: Sullivan Square has the potential to be “a walkable job and housing center with access to quality transit,” and goes on to note that this would require that “strategic infrastructure investment, potentially including open space, would be needed to address congestion and flooding vulnerability in Sullivan Square and nearby areas.”

The many comments that the City will receive about the project will provide both detailed technical and moving personal information about the project and its impacts on the Charlestown community. To put the project in a larger context, WalkBoston has reviewed the City’s plans for transportation (GoBoston 2030), resilience (Climate Ready Boston), and long range planning (Imagine Boston 2030). The table below puts the SS/RA in the context of the goals that these plans set for the City. We believe that the goals clearly point to the surface option as the right choice for the project.

If the City carries both options to further levels of refinement, we ask that several technical assessments be included:

1. Estimated number and severity of total traffic crashes for the entire roadway system from the Mystic River to Austin Street for each mode: pedestrians, bicycles, transit users and vehicles. We believe that the crash statistics cited on page 29 of the 2/28/17 slide show do not represent an accurate picture of the impacts of the project designs on all crashes. (see note below)

2. Measure the total land area devoted to roadway surface and “unbuildable” air rights parcels in each alternative.

3. Measure the longest distances that are not traversable by pedestrians between intersections: (1) from the bank of the Mystic River at Alford Street to the first pedestrian crossing, (2) from northern D Street south toward Baldwin Street), (3) north from Austin Street.

4. Estimate the walking travel time from the corner of Main and Bunker Hill Street to Sullivan Square Station.

5. Provide construction and fifty-­‐year operation/maintenance cost estimates for each proposal.

6. Describe in detail how vehicles using a Rutherford Ave tunnel will be slowed to 25-­‐30 mph when they emerge onto the surface portions of Rutherford Ave.

Let’s not put the design of Sullivan Square/Rutherford Ave on the wrong side of history. We don’t want to build new streets with underpasses that are “relics” before they are built.

Thank you for your consideration.

Best Regards,

Wendy Landman
Executive Director

Cc Chris Osgood, Chief of Streets, Transportation and Sanitation
Commissioner Gina Fiandaca, Boston Transportation Department
William Conroy, Project Manager Boston Transportation Department
Tad Read, Boston Planning and Development Agency
Peter Furth, Northeastern University
Amy Branger, Liz Levin, Emma Rothfeld Yashar, WalkBoston Board members and advocates from Charlestown

Note: Peter Furth provided WalkBoston with the following information about the cited crash statistics. “They are using Highway Safety Manual’s general 42% reduction in crash rate when an at-­‐grade intersection is converted to a grade-­‐separated interchange. It’s obvious, but worth emphasizing: a grade separated interchange is NOT what’s proposed for Sullivan Sq; what’s proposed is a flyunder, akin to a flyover. The HSM has no data on flyover / flyunder conversions. They are making a logical leap by using a reduction that comes from complete grade separation. On the slide they write “*Applies to Underpass Movements Only,” meaning they intend to apply that reduction only to cars who will use the underpass. However, that suggests that a flyunder will leave all the other traffic unaffected. That is not proven (there is no data), and moreover, there are good reasons to expect that crash rate will go *up* for the other traffic. One reason is that the only traffic removed by the flyunder is thru traffic; all the turning traffic, which carries higher crash risk, remains, and furthermore will be concentrated. More importantly, the space required for the flyunder structure forces the at-­‐grade intersection to have an unfavorable geometry, with the left turn lanes that flank the underpass separated from each other in a way that results in interlocking left turns, which are less efficient and (probably) less safe. Nobody would ever lay out an intersection that way if they weren’t constrained by the structure of the flyover / flyunder. That change could have an unfavorable safety effect that erases the gains enjoyed by thru cars that get to bypass the intersection.”