Comments on the Charles River Resource Management Plan

Comments on the Charles River Resource Management Plan

October 31, 2014

Secretary Maeve Vallely Bartlett
Executive Office of Energy and Environmental Affairs (EEA)
100 Cambridge St., Suite 900
Boston MA 02114

RE: Comments on the Charles River Resource Management Plan

Dear Secretary Vallely Bartlett:

WalkBoston reviews public planning documents to identify potential implications for pedestrians. The following comments are based on our review of this document:

We are very excited about the opportunities presented for potential improvements in the 3- mile long section of riverfront between the Harbor and the BU Bridge. Because the document gives each proposed improvement a priority ranking, we are able to sense where DCR is moving in its schedule to improve the Lower Charles River Basin.

Many of the improvements proposed are essential for all users of the parks and nearby neighborhoods. We commend DCR for its foresight in working toward protection from flooding that might be anticipated in the wake of Hurricane Sandy two years ago. Improvements to the dam between the river and the harbor will protect the basin, and much of the Back Bay and portions of Cambridge, from flooding.

We are also happy that DCR has been active in working on both the proposed South Bank Bridge behind North Station and the “drawbridge walkway” to be constructed as part of an MBTA replacement bridge. These measures will complete the connection of the riverfront paths with the Harbor Walk.

A related improvement is the proposed walkway behind the Science Museum that would provide connections into the museum, pass over the locks with a new bridge and perhaps through the state police barracks to connect with riverside paths and the existing sidewalk in front of the Museum. This improvement would add capacity of the paths around the basin by providing a new pathway for walkers and runners who currently have no option other than the narrow sidewalk that lies along the reconstructed Craigie Dam roadway.

The partnership of DCR and The Esplanade Association has resulted in proposals that are also moving forward. The relocation of Storrow Drive under one of the Longfellow Bridge arches will provide new park space. Overall goals of the Association’s Esplanade 2020 proposals include revitalizing the area around the Hatch Shell with redesigned paths, a café, and areas for audiences attending Hatch Shell performances. One of the recurring issues in the Hatch Shell work has been the mixing of pedestrians and bicycles at the proposed café that cannot be avoided until a high-speed bicycle path, separated from pedestrian ways, is provided under the Fiedler Footbridge.

We are very pleased the concept of providing separate paths for pedestrians and cyclists is a major feature of the report. In some cases, this kind of separation already exists, as in portions of the Boston Esplanade. In others, such as the Cambridge Esplanade, it will be a major improvement to separate paths for a substantial portion of the riverfront. This design provides high-speed bicycle commuters a special route away from quieter activities, such as strolling or playing with children. We trust that the users of the Cambridge Esplanade will benefit from a proposed greensward with trees and a slight differential in elevation that promotes safety by discouraging a mix of fast cyclists and slower users of the paths.

The report also cites several management issues that require relatively small expenditures. For example, the attention given to removing or controlling geese is important because the birds have become dominant in some sections of the Basin, interfering with safe, healthy and pleasant walking on paths near the River. Snow removal is extremely important to walkers and runners who use the riverside facilities during all months of the year.

However, WalkBoston is concerned that the aspirations expressed in the document do not extend as far as they might. We hope that DCR will explore giving more attention to the following issues.

Minimum widths for paths
The report points out that some stretches of paved paths are only five feet wide. This is insufficient to serve the mix and volume of users, often including both pedestrians and bicyclists. It is clearly inadequate for a multi-use path.

Reliance on multi-use facilities
Pedestrian volumes in the riverfront between the BU Bridge and Boston Harbor are significant. These volumes are reflected in user surveys undertaken by DCR and others, where “walking for pleasure” was shown to be the single most important purpose for many people using the parkland. In another survey, 55% of the respondents cited “congested pathways” as an issue they hoped would be addressed. In the same survey 86% of the respondents would support “separating paths by user types.” 67% of respondents reported a negative experience in using the park, with the majority citing the conflict of pedestrians and cyclists.

These surveys indicate that walkers desire safe and pleasant alternatives to multi-use paths. While it is not feasible to provide separate pedestrian paths along the full length of the corridor, it is clearly a desirable feature to include throughout the wider portions of the park. Multi-use paths would thus be limited to those locations where there are no other options such as narrow stretches of parkland or the recently completed North Bank Bridge.

Provisions for runners and joggers
One of the goals stated in the report calls for safe and continuous bicycle, skating and pedestrian access along the entire length of the park. We would add to that list of users the many runners and joggers who use River paths because they are relatively safe and removed from vehicular traffic.

While runners and joggers do not directly compete with pedestrians for space, they are better served by softer surfaces than asphalt or concrete. “Soft surface” paths have been discussed in locations such as the Greenough Boulevard reconstruction, where separate paths are proposed to serve cycling, walking and running. While the separation of walking and cycling paths is a recurring theme in the report, the possibility of also providing a separate path for runners is not. We would suggest including it in any revisions that might be forthcoming. The presence of so many “goat paths” adjacent to the paved paths clearly point to the need.

Thank you for the opportunity to comment on this important project. Please feel free to contact us with any questions.

Sincerely,

Robert Sloane
Senior Planner

Comments on Longfellow Bridge Rehabilitation (MassDOT File No. 604361) and Craigie Bridge Reconstruction

Comments on Longfellow Bridge Rehabilitation (MassDOT File No. 604361) and Craigie Bridge Reconstruction

October 28, 2014

Richard Davey, Secretary
MassDOT
10 Park Plaza
Boston, MA 02116

Email: Richard.Davey@state.ma.us

Re: Longfellow Bridge Rehabilitation (MassDOT File No. 604361) and Craigie Bridge Reconstruction

Dear Secretary Davey;

We are writing to you regarding two outstanding issues for bicycle and pedestrian accommodation related to the Longfellow Bridge Reconstruction project. As we approach the annual Moving Together Conference which focuses attention on MassDOT’s support for and promotion of active transportation, we think this is a perfect time for MassDOT to demonstrate its commitment by taking positive action on these issues.

Craigie Bridge Reconstruction

From the outset, we have advocated strenuously for the provision of bicycle facilities on the Craigie Bridge/Dam. Many public hearings were held and DCR and MassDOT promised clearly and consistently that bicycle lanes would be established on the Craigie Bridge/Dam (aka O’Brien Highway between Land Boulevard and Charles Circle) as part of the Longfellow Bridge construction project, once the Longfellow Bridge was reopened. While we did not concur that the establishment of the bicycle lanes should wait – it would have been far better to construct them from the outset, a position we continue to maintain – we fully expect that the committed‐to bicycle lanes (or cycle tracks) will be constructed. To our frustration, we have learned that the latest plans do not include this work.

We would like your assurances that bicycle lanes will be included and we would also like to see the actual plans that include this promised component of the design.

Longfellow Bridge

We do not think that the proposed design connecting bicycle lanes on the Longfellow Bridge with Main Street in Cambridge is the safest option. The proposed design puts cyclists in an exposed, highly uncomfortable, and dangerous situation, situating them between two high‐speed travel lanes and having a long area with conflicts with turning vehicles. Many cyclists will not follow the path of travel, staying either in the right lane or traveling on the sidewalk risking conflict with pedestrians under these conditions.

We recognize that this design follows traditional AASHTO guidance, which was developed quite a while ago, without the benefit of the wealth and breadth of experience and design guidance we have today. Fortunately, there is a better solution, proposed by the City of Cambridge, which we endorse for its benefits to pedestrian, cyclist, and car safety. The updated proposal (design attached as Exhibit A to this letter) is demonstrably preferable from a cyclist’s perspective and is also beneficial for pedestrians. A clear, comfortable bicycle facility that accommodates all riders will minimize the likelihood that any cyclists will ride on the sidewalk. In addition, a better crossing facility that slows traffic and focuses the yield situation will help pedestrians crossing as well. MassDOT’s proposed design, which incorporates a lengthy car‐bike conflict zone and obligates cyclists to ride between two high‐speed traffic lanes, can be expected to place bicyclists at considerable risk and thus is likely to induce bicyclists to ride on the sidewalk or deter them from riding across the bridge westbound at all. We are concerned not only about the fact that the MassDOT design will encourage high‐speed traffic and make it less likely that motorists will yield to bicyclists, but also that they will be less likely to yield to pedestrians.

We would like MassDOT to modify the current proposal and adopt the Cambridge proposal instead. We would be happy to meet with you to review our concerns.

Very truly yours,

Steven Bercu, Boston Cyclists Union

Renata Von Tscharner, Charles River Conservancy

Steven Miller, Livable Streets Alliance

David Watson, MassBike

Wendy Landman, WalkBoston

Cc: Patrick Crowley
Patrick.Crowley@jacobs.com

Frank DePaola, MassDOT
frank.depaola@state.ma.us

Ken Lamontagne, MassDOT
kenneth.lamontagne@state.ma.us

Steve McLaughlin
Steve.Mclaughlin@state.ma.us

Mark Gravallese
mark.gravallese@state.ma.us

 

Exhibit A

City of Cambridge Proposed Design for Longfellow Bridge

Attached.

 

WalkBoston statement on the Anderson Bridge Underpass

WalkBoston statement on the Anderson Bridge Underpass

WalkBoston enthusiastically supports the construction of the underpass for walkers, runners and cyclists beneath the Anderson Bridge, as well as the suggestion that evaluation of this underpass might lead to similar underpass routes beneath approaches to the River Street and Western Avenue Bridges.

Underpasses add significantly to the capacity of the riverside paths and also add to the network of off-road movement options along and across the Charles River. Capital improvements for the surface of all three bridges have been discussed in detail over the past few years and initial plans show positive agency responses to our advocacy for pedestrian movement across those bridges.

The Charles River paths are a key part of the broader transportation network. This proposal highlights the necessary interconnections and reinforces the need for DCR to receive increased funds for the maintenance of these and other riverside facilities.

Boston Globe: “Anderson bridge proposal backed” 8/5/2014

Learn more about the Charles River Conservancy’s Underpasses Advocacy Campaign.

Bridge Project Management, Project File No. 606475 (Allston / I-90 Massachusetts Turnpike Interchange Improvement Project)

Bridge Project Management, Project File No. 606475 (Allston / I-90 Massachusetts Turnpike Interchange Improvement Project)

April 24, 2014

Patricia Leavenworth, P.E., Chief Engineer
MassDOT
10 Park Plaza
Boston, MA 02116

ATTN: Bridge Project Management, Project File No. 606475
Delivery via email to dot.feedback.highway@state.ma.us

Dear Ms. Leavenworth,

WalkBoston is pleased to provide comments on the Allston I-90, Massachusetts Turnpike Interchange Improvement Project and the April 10, 2014 public meeting. We are also pleased to have been invited to participate in the project advisory group.

We write to note the issues that we hope will be addressed by the project, some of them to be included in long-range planning and others to be included in project design – but all of them will contribute to the successful reclamation of a large and important piece of the City that has for too long been disregarded as a part of the surrounding community.

1. Project scope – The scope of the project needs to extend far enough along the Turnpike to look at bigger picture auto circulation, including access between the Longwood Medical Area, the Fenway, Back Bay and the Turnpike and relief of traffic at the Bowker Overpass and on Storrow Drive. Addressing these major vehicular demands will potentially provide significant opportunities to enhance the regionally important open space, walking, running and bicycling assets along the Charles River.

2. Pedestrian access throughout the project – Scoping of the project should include guidelines for designs to facilitate pedestrian travel through the project and into surrounding neighborhoods.

3. Air rights development – Intensive use of the air rights above the rail yards and the Turnpike can be foreseen as part of any long-range plan. Ramps and access roads, the mainline of the Turnpike and the commuter rail yards should be designed to accommodate development of the air rights.

4. Land uses in the newly available land – The needs of the community and adjacent institutions should guide development, rather than the needs of traffic to and from the Turnpike. Traffic needs should not limit the explorations of the potential uses of the land.

5. Affordable housing for residents of Allston – Housing goals should be outlined early to permit inclusion in all aspects of the study.

6. Minimize the impacts of regional traffic on neighborhood streets – The alignment and connections of turnpike on and off-ramps should be designed to minimize cut through traffic and to protect the integrity of residential areas.

7. Rail Yards – The design for reconstruction of the rail yards should minimize the number of required tracks (possibly looking at other locations to provide some of the necessary rail yards) and provide footprints for the supporting columns that enable air rights development above them.

8. Commuter rail station – The design of a new West Station should be advanced to a point where its location and likely dimensions are known, to allow for planning its access to proceed as part of this project. Station access should be provided for both sides of the rail tracks between North Allston and Commonwealth Avenue.

9. Reconnecting Packard’s Corner area and North Allston – An impenetrable wall of rail tracks and the Turnpike will separate the two parts of this neighborhood forever, unless provision for crossing is planned from the beginning, either with air rights or with bridges, or both.

10. Transit access – Bus, commuter rail and other modes of public transportation should be considered as part of the overall design at a very early date.

11. Turnpike main line – The lanes in the new portion of the Turnpike between Agganis Way and Cambridge St. should be separated sufficiently to allow for the construction of supporting columns for new uses on air rights above the Turnpike.

12. Turnpike access ramps – Access ramps should be designed in spare and efficient ways that afford the maximum use of the land for non-transportation purposes. Short tunnels should not be excluded from consideration.

13. Storrow Drive Alignment – A long-range plan for the area should include relocation of a portion of Soldiers Field Road away from the river. All access to and from the Turnpike and Cambridge Street should take this into consideration and not preclude potential options for connections.

14. A new park along the river – Relocation of Storrow Drive away from the river allows expansion of the adjacent parkland, which is now very narrow and constrained.

15. Connecting the area with the Charles River – Alternatives should be examined for connections between development in this area and the river for both pedestrians and bicycles.

Thank you for the opportunity to provide input to the project.

Best regards,

Wendy Landman
Executive Director

Bob Sloane
Senior Project Manager

“In advance of the first public meeting on the project, scheduled for Thursday night, the wish list for the project and accompanying free land is as wide-ranging as it is lengthy: A network of world-class bike and walking paths. A Harvard campus expansion. Thousands of new housing units. A Boston Marathon memorial pedestrian overpass. A hulking Olympic stadium. A new West Station that could provide a rapid transit rail link between Allston and Cambridge.” – excerpt from Plans for straightening Mass. Pike stir expansive visions, article by Martine Powers, Boston Globe, 4/10/2014. Photo by Jonathan Wiggs / Globe Staff.

FULL ARTICLE:
http://www.bostonglobe.com/metro/2014/04/09/highway-project-holds-promise-for-revamped-region/2lCX89t55FWnHWSxmZe2xM/story.html