Author: walkboston

Rethinking The Turnpike Allston Interchange

Rethinking The Turnpike Allston Interchange

WBUR: “Rethinking The Turnpike Allston Interchange

Could the Allston I-90 Interchange Improvement project create a more accessible Charles River for pedestrians, bicycles and recreation? We speak with two advocates who are asking for more green space at the point where I-90, the train tracks and Soldiers Field Road squeeze together between Boston University and the river bank — “the throat.”

Guests Harry Mattison is a member of the I-90 Interchange Task Force and the Charles River Conservancy. He tweets @harrymattison. Wendy Landman is the executive director of the non-profit advocacy group WalkBoston, which tweets @walkboston.

Posted February 7, 2018

Comments on Suffolk Downs redevelopment (EEA No. 15783)

Comments on Suffolk Downs redevelopment (EEA No. 15783)

January 25, 2018

Mayor Brian Arrigo
ATTN: Robert O’Brien, Director of Economic Development
City of Revere
281 Broadway
Revere, MA 02151

Secretary Matthew Beaton
ATTN: Page Czepiga, MEPA Analyst
Executive Office of Energy and Environmental Affairs
100 Cambridge Street, Suite 900
Boston, MA 02114

Director Brian Golden
ATTN: Tim Czerwienski, Project Manager
Boston Planning and Development Agency
One City Hall, Ninth Floor
Boston, MA 02201

RE: WalkBoston comments on Suffolk Downs redevelopment (EEA No. 15783)

Dear Mayor Arrigo, Secretary Beaton and Director Golden:

Thank you for the opportunity to comment on HYM Investment Group’s proposed redevelopment of the Suffolk Downs site in East Boston and Revere. WalkBoston looks forward to working with the City of Revere, EEA, BPDA, HYM, and other agencies and project stakeholders to help advance the proponent’s stated goal of “creating a vibrant, mixed-use walkable community.”

Leveraging connections between walkability and transit

The proponent’s Expanded Project Notification Form (EPNF) reflects a strong commitment in principle to walkability and multimodal transportation connectivity. The proposed Phase 1 project emphasizes new pedestrian connections at the Suffolk Downs Blue Line station on the MBTA, and the Master Plan project is similarly premised upon pedestrian access to and from the Blue Line at Suffolk Downs and Beachmont Stations. Overall the Suffolk Downs site is wellpositioned for walkable transit-oriented development, which is reflected in HYM’s high anticipated mode shares for walking and transit for the Master Plan project. (The projected mode shares for walking range from 10.9% for office uses to 19.6% for residential uses; the projected mode shares for transit range from 45.4% for residential uses to 54.7% for hotel uses.)

The Phase 1 project has a much lower projected transit mode share of 37.5%, as well as a 44.4% projected mode share for single occupancy vehicles. We are concerned that this will create significant auto dependency from the onset of this project that will affect the future Master Plan development as well. The proponent states that “while there will be emphasis to support a high proportion of alternative trip making by the Phase 1 Project, this more conservative mode share profile has been utilized given the Phase 1 buildings are being analyzed as a standalone project without the benefit of a mixed-use environment.” We urge the proponent to aim for more ambitious transit, walking and biking mode share goals for the Phase 1 development to maximize the site’s potential for transit-oriented development.

The proponent also anticipates over 54,000 new transit trips per weekday, including over 4,000 trips during the morning peak hour and over 5,000 trips during the evening peak hour. This number is very high relative to current Blue Line ridership levels. As part of their transit analysis for the Draft Environmental Impact Report (DEIR), HYM should detail how they arrived at this number and how Blue Line ridership will change as the Master Plan project is phased in over time. This analysis should be accompanied by the proponent also clarifying their plans to invest in capacity upgrades along the Blue Line as part of a broader package of Transportation Demand Management (TDM) strategies.

Exploring opportunities to reduce single occupancy vehicle trips and parking spaces

While the high projected transit mode share and ridership are positive attributes of this development proposal, the proponent still projects over 33,000 new vehicle trips per weekday, including over 3,000 trips during the morning peak hour and over 3,000 trips during the evening peak hour. This increased vehicular traffic has the potential to significantly affect congestion and pedestrian safety within the project site and along surrounding roadways. Given that vehicular access to the site is limited to just two intersections (Route 1A/Tomasello Way and Winthrop Avenue/Tomasello Way), the proponent should clarify how the project site and surrounding streets will handle this traffic in the DEIR. Significant mitigation measures will be necessary to address 33,000 new vehicles on already congested streets.

While HYM does not specify how many new parking spaces will be needed to accommodate these vehicles, WalkBoston calculates that between 10,800 and 16,200 new spaces will be necessary, depending on the development program and parking ratios used. (The proponent states that the following parking ratio ranges should adequately support the Master Plan project’s parking demand into the future: residential, 0.5 to 1.0 spaces per unit; office, 1.0 spaces per 1,000 SF; lab, 1.0 spaces per 1,000 SF; hotel: 0.5 spaces per room; retail: 0.5 spaces per 1,000 SF). We are encouraged by the relatively low proposed parking ratios for the residential units, as well as HYM’s broader recognition that auto trip rates are likely to decrease over time. The final residential parking ratio should be as close to 0.5 spaces per unit as possible and we look forward to reviewing HYM’s TDM plans as part of the DEIR. Any strategies and mitigation measures proposed must further enhance walkability, bikeability and transit access, while reducing single occupancy vehicle use and the associated need for parking.

Exploring opportunities for bus/shuttle connectivity and related pedestrian access

HYM notes that there are several MBTA bus lines (450, 459 and 119) along Route 1A and Winthrop Avenue within a half-mile walk of the project site, and that “there are opportunities to expand MBTA bus service into the project site and provide for internal site transportation/shuttle to further improve access to public transit” as the Master Plan project is built out. The proponent should further explore and detail these options as part of their TDM plans in the DEIR, as increased utilization of MBTA buses and/or shuttles can reduce single occupancy vehicle use. An analysis of bus/shuttle options should examine the potential for increased service on existing MBTA bus lines and associated changes in ridership, as well as the potential to service the neighborhoods surrounding the project site. The proponent should also clarify their plans for investing in such services, whether through funding the MBTA or their own shuttles.

Ensuring that pedestrians can safely and comfortably walk to and from bus/shuttle stops is critical to ensuring that these services will be utilized. Ideally bus/shuttle stops will be located within a quarter-mile of the project site to maximize their usage. We appreciate HYM’s commitment to improving sidewalks adjacent to the project site to meet ADA standards and to include street trees if feasible, as well as their acknowledgement of the need for mitigation measures and infrastructure improvements at the site’s primary vehicular access points (Route 1A/Tomasello Way and Winthrop Avenue/Tomasello Way). The proponent states that “geometric and traffic signal improvements will be recommended at both of these intersections to optimize traffic operations.”

Improvements at these locations must also address pedestrian safety and traffic calming. HYM plans to widen Tomasello Way and Route 1A as part of the Master Plan improvements, yet there are no crosswalks across Route 1A near the project site and the crosswalk across Tomasello Way at Route 1A is already 140 feet wide with minimal pedestrian refuge. Any signal and roadway upgrades at this location and near other shuttle/bus stops must provide safe pedestrian crossings and well-timed WALK signals that provide countdowns and leading pedestrian intervals. Long crossing distances should be reduced as much as possible using curb extensions, and pedestrian refuges should be created and enhanced to provide protected waiting areas. In extreme circumstances, the proponent might consider working with the MBTA to relocate bus stops to more pedestrian-friendly locations.

Creating a walkable project site that meets Complete Streets standards

In addition to leveraging pedestrian access to and from the Blue Line, the proponent has integrated walkability and pedestrian connectivity into many other aspects of their redevelopment proposal. These include creating a new interior street network on site that meets Boston Transportation Department’s (BTD) Complete Streets guidelines, developing a system of multi-use ADA-compliant paths and trails that connects to adjacent neighborhoods and regional path networks, and activating the public realm with open space amenities and extensive ground-floor retail. Creating streets, sidewalks and paths that accommodate road users of all abilities and travel modes is critical to developing more livable and walkable communities, so WalkBoston is pleased to see a commitment to these issues in the EPNF.

We look forward to seeing more detailed plans for the interior streets, paths, intersections and signals as part of the DEIR. The interior streets should be designed to ensure that vehicles follow a 20 mile per hour speed limit to maximize walking safety as well as walking and transit mode shares. They should also include additional measures for pedestrian safety and traffic calming, including narrow vehicular travel lane widths, frequent and well-marked crosswalks, and well-timed WALK signals that provide countdowns and leading pedestrian intervals. We encourage the proponent to maintain their current plans to not have vehicular access to the project site from Bennington Street or Waldemar Avenue, thus prioritizing multimodal connectivity and reducing the potential for increased local traffic.

Improving pedestrian safety throughout the project study area

The need for traffic mitigation is not limited to the immediate project vicinity and access points. To this end, HYM states that a mitigation program will likely focus on improvements to roadway geometry, traffic signals, and multimodal mobility along the broader Route 1A and Winthrop Avenue corridors, as well as Furlong Drive, the on-site roadway network, and other nearby intersections. The proponent also notes that many of the broader study area intersections are located within Highway Safety Improvement Program (HSIP) clusters and thus are potentially subject to Road Safety Audits (RSAs) per Massachusetts Department of Transportation guidelines. WalkBoston looks forward to reviewing a more detailed discussion of the Master Plan project mitigation phasing and recommendations for the timing of specific roadway improvement projects as part of the DEIR. We are also available to participate in future RSAs as needed. Once again, we encourage utmost consideration for pedestrian safety and traffic calming measures as part of any improvement packages.

Thank you again for considering these issues and feel free to contact us with any questions.

Sincerely,

Wendy Landman
Executive Director

Cc: House Speaker Robert DeLeo
Senate President Harriette Chandler
Senator Joseph Boncore, Transportation Co-Chair
Representative William Strauss, Transportation Co-Chair
Representative Adrian Madaro
Boston City Council President Andrea Campbell
Boston City Councilor Michelle Wu, Transportation Chair
Boston City Councilor Lydia Edwards, District 1
Revere City Council President Jessica Giannino
Revere City Councilor Steven Morabito, Economic Development and Planning Chair
Revere City Councilor Joanne McKenna, Ward 1
Becca Wolfson, Boston Cyclists Union
Stacey Thompson, LivableStreets Alliance
Andre Leroux, Massachusetts Smart Growth Alliance
Richard Fries, MassBike Marc Ebuña, TransitMatters
Chris Dempsey, Transportation for Massachusetts

Transportation and Climate Comment Letter

Transportation and Climate Comment Letter

Dear Secretary Beaton and Secretary Pollack,

Thank you for this opportunity to comment on transportation sector strategies to reduce greenhouse gas emissions and improve climate resiliency in our Commonwealth. WalkBoston believes that policies and programs that encourage equitable, compact, mixed-use transit oriented development and that drive mode shift from single occupancy vehicles to walking, biking and transit are critical to meeting these objectives. We look forward to working with your agencies and our partners in the transportation advocacy community to advance these issues.

Read the full letter: WalkBoston-Comment-TransportationClimate

Mobility Challenges In The Boston Snow

Mobility Challenges In The Boston Snow


WBUR: “Mobility Challenges In The Boston Snow

Navigating a city with snow on the ground is difficult enough as it is, but what about for mobility impaired residents?

WalkBoston, a nonprofit that makes walking safer and easier in Massachusetts, produced a video about Amy Corcoran Hunt that draws attention to the mobility challenges that poor plowing and shoveling can bring.

Posted January 11, 2018

Cambridge: East Cambridge and Kendall Square Walking Map

Cambridge: East Cambridge and Kendall Square Walking Map

The center of East Cambridge retains much of its early residential character with a vital focus on the Middlesex County courts. The community is located within easy walking of neighboring areas where construction activity booms—Kendall Square with its new offices and North Point where high-rise residences face the Charles River. In 1810, the wealthy investor Andrew Craigie envisioned a community on an island surrounded by salt marshes linked to the Charles River.

Connecting this island to Boston via a new toll bridge (present Science Park Dam), Craigie laid out a grid of streets and began attracting development to the area. The marshes were filled by railroads and industry. In the late 20th century, the riverfront was beautified; traffic was diverted onto new boulevards. Old industrial buildings were rebuilt as offices. Pedestrian routes linked residential, employment and recreation areas at the Charles River..

Click for “East Cambridge and Kendall Sq Walking Map” PDF


Click for “East Cambridge and Kendall Square Walking map” on Google Maps